Employment tribunal deadline calculator
Updated 13 November 2026
From 1 October 2026 the standard time limit to bring most tribunal claims doubles from three months to six, but only for things that happen on or after that date. This calculator applies the correct regime automatically and factors in Acas early conciliation, which most other calculators skip.
Work out your deadline
Why this needs a calculator most tools skip
The change comes from Schedule 12 to the Employment Rights Act 2025, and the regulations that brought it into force (SI 2026/954, regulation 4) have a transitional rule most calculators don't implement: the extended six-month limit only applies where the relevant date is on or after 1 October 2026. The relevant date differs by claim type: for a dismissal it is the effective date of termination, for unpaid wages the payday, and for discrimination over a period the end of that period. If your dismissal was in September 2026, you're still on the old three-month clock even if you're filling this in during November. Both regimes run side by side for months, which is exactly the situation this tool is built to handle correctly.
What early conciliation actually does to the date
Contacting Acas for early conciliation pauses your limitation clock while it runs, and you're guaranteed at least one month after your certificate date to lodge a claim, even if almost no time was left when you started. Since 1 December 2025 the maximum conciliation window is 12 weeks, up from six, which can meaningfully extend your deadline if conciliation runs long. The extension is the number of days conciliation actually took, so if you have not yet received your certificate the tool cannot give a reliable date: it shows the earliest-safe deadline, and you should lodge as soon as the certificate arrives. Combined with the six-month base period, some claimants now have over nine months in total before a claim must be filed.
What this tool doesn't cover
The tool takes one start date and applies the rule for dismissals and most other claims; the date that counts as the start differs by claim type, so check you have entered the right one. It does not model claims with a different starting point or limit: unpaid wages run from the payday, discrimination over a period from the end of the period, TUPE consultation from the date the transfer is completed, and equal pay and statutory redundancy pay already had six months. Breach of contract claims in Scotland moved to six months only on 9 November 2026. Northern Ireland has its own system. And this only estimates a working deadline; it isn't a substitute for checking with Acas directly or a solicitor, especially if your date is close. For the wider context on what changed and why, read our explainer on the Employment Rights Act changes.
Quick answers
- Does the calculator decide three months or six?
- It uses the date your claim runs from, such as the effective date of termination for a dismissal. Before 1 October 2026 the standard limit is three months less a day; on or after that date it is six months less a day.
- Does it include the Acas pause?
- Yes, if you enter the dates you contacted Acas and received the certificate. With only the Acas contact date it shows an earliest-safe deadline, not a final one.
- Is the result legal advice?
- No. It applies the published rules in your browser. Confirm close dates with Acas or a solicitor.